Our Recent Construction Project Case Studies

We’ve put together a collection of some recent projects which we’ve completed throughout Bolton, Wigan and surrounding areas. We place a large emphasis on all our service levels and our continual improvement drive is centered upon the committed attitude and politeness of our staff and operatives, quality, sustainability and how we deal with queries or potential complaints. Upon the completion of every contract a client satisfaction form is sent out as a controlled means of measuring and monitoring such performance.

For more information on any of our case studies or to discuss your own project, contact us.

Refurbishment: Care Chiefs Children's Nursery

Project overview:Buildmain carried out alteration and refurbishment works to existing Public House, converting to Children’s Day Nursery, to Architects’ design and OFSTED rules and Regulations.

  • Client:Care Chiefs Children’s Nursery
  • Architect: Kreative Design Solutions
  • Contract: 2015
  • Value: £200,000.00
  • Duration: 7 weeks
  • Conversion of a Public House to a Children’s Day Nursery
     

The site comprised of ground and first floor and roof levels of the two storey commercial office building Works undertaken included:

  • General stripping out works
  • First and Second floor alterations and refurbishment works
  • Partition and suspended ceiling installation
  • WC Cubicles and Welfare
  • Plastering
  • All joinery
  • New internal doors and Ironmongery
     
  • New floor covering
  • Replacement of heating
  • Electrical re-wire installation
  • New hot and cold water services
  • Minor Roof Repairs
  • New external fencing and shutters
  • External repairs and alterations to entrance ramps, pathways, car park
     

Strip Out
Carefully strip out all back to shell, existing welfare, shelves, racking, kitchen units, dry lining, bar equipment, heater covers, window sills, light fittings, distributions board, cellar equipment, flooring, signage etc. and dispose of them.

Suspended Ceilings
Supply and fit new 600 x 600 mm white satin spar ceiling tile fitted on white grid to required ceiling height.

Joinery
Supply and install FD30 doors paint grade and frames to all rooms plus all associated ironmongery, including intumescent strips as required Steel butt hinges per door.

Plastering Works
Prepare all walls affected by building works, apply PVA to any bare walls, dry line with 12.5mm plasterboard or make good, back fill all chases made by mechanical trades, apply skimming plaster to make good all affected areas as required.

WC’s and Welfare
To WC accommodation provide new sanitary ware, cubicles, vanity units, 3 No stainless steel sink stations with taps, tiling, floor finishes and ceilings and lighting. Position and number of WC’s, washbasins, urinals, etc. strictly to Care Chiefs specification.

Plumbing and Heating
Supply full new central heating system, 2 No ideal logic 18 heat only Boilers to accommodate 20 No LST Radiators complete with TRVs and 8 No Panel K Radiators, all plumbed with copper tube fittings, brackets and fixings, programmable room stat, 7 day programmer and 90ltr unvented cylinder.

Staff Room and Kitchens
Supply and fit 1000 base unit, 500 drawer pack, 2 no 1000mm High level units, 40mm work top, running plinth all fixtures and fittings to Care Chiefs specification, splash back ceramic tiles.

Decorations
Strip off existing wall coverings where provided and thoroughly prepare all wall surfaces to smooth level finish. To all previously painted woodwork, thoroughly prepare and decorate with one coat undercoat and two coats eggshell to existing plaster surfaces, thoroughly prepare in accordance with work clauses and apply two coats of Leyland/Johnstone matt emulsion To new plaster surfaces, thoroughly prepare in accordance with work clauses and apply one thinned matt emulsion followed by two coats of Trade matt emulsion. To the new plaster suspended ceiling margin, thoroughly prepare and decorate with 1 thinned coat of Trade Matt Emulsion followed by two coats of Trade Matt Emulsion To required doors, prime, undercoat and gloss. Decorate walls in reception, corridors, all rooms and welfare area in accordance with Care Chiefs instructions.

Floor Covering
As of OFSTED specification

Miscellaneous
Remove existing vestibule and entrance door, remove brickwork to front elevation to form opening to take UPVC Frame and safety glazing. Supply and fit aluminium double leaf manually operated type SD swing doors with fanlight, Double glazed safety units, polyester powder coated. Create glass sliding reception window. Supply and fit digital locks wherever required.

External Works
Remove existing cellar hatch from yard area, construct steel supports and create concrete plinth, alteration to soil drainage layout. Carry out minor roof repair, erect Wane lap fencing as instructed by Care Chiefs.

Car Park
Tarmac and line mark required areas.

Building Alteration Works: Droylsden Academy Works

Case study – Droylsden Academy

  • Client: Droylsden Academy
  • Architect: Green Sky
  • H & S: Eurosafe
  • Value: £170,000.00
  • Duration: 8 Weeks
    August-September 2015
     

Building Alteration Works
Buildmain carried out various alteration and refurbishment works to Droylsden Academy.
Altering of existing PA Office’s & Art Room.
Construct new admin office’s areas. Infilling of a 10 x 5m of existing floor aperture to 2nd floor including all structural steel works.
The Removal and alteration of the glass balustrades.
Construction of single person individual learning stations all to Architects’ design and CDM Regulations. Liaise with building control.

The premises required various types of alterations to improve the already first class facilities provided by the client. The project had a limited window of opportunity for completion, Buildmain Ltd planned and project managed the works which took place over the summer holiday break.

Works where completed in budget and on time

Project Particulars

Scope of Works

  • Pre start and preliminaries
  • Site set up & welfare
  • Internal scaffold access to floor infill
  • Site strip as required
  • Removal of glass balustrades
  • Steel installation (Floor infill)
  • Installation of structural timbers, insulation & acoustic boards to floor in fill
  • Full electrical rewire to 1st and 2nd floor office block
  • Construction of Fire & Sound partition works to demark new offices areas layout
  • 1st fix joinery & 2nd fix bespoke joinery
  • Glazing package
  • 1st & 2nd fix electrical works
  • 1st & 2nd fix data, voice & media package
  • Full A/C package to new office & open areas
  • Full Ventilation package to new office & open areas
  • Full Decoration
  • Part flooring specification
  • Fire alarm alteration, test & inspection
  • Removal of all access scaffold
  • Site clearance
  • Cleaning schedule
  • Hand over
  • Full O &Ms Package provided to client

Full Refurbishment Works: Vivalis Ltd Newbury House Refurbishment Works

Case study – Vivalis Ltd Newbury House Trowbridge – Phase 2

  • Client: Vivalis Ltd
  • Architect: N/A
  • Value: £110,000.00
  • Duration: 8 Weeks March 2015
     

Full Refurbishment Works
Further to the works carried out for the client previously in 2014 we were asked to carry out full refurbishment to their neighbouring office.

The premises required a full bespoke makeover so Vivialis could let the new premises in Trowbridge to a client. Buildmain Ltd planned and project managed the works which consisted of carrying out full refurbishment works to Newbury House.

Project Particulars

Scope of Works

  • Pre start and preliminaries
  • set up & welfare
  • Site strip as required
  • Asbestos removal
  • Demolition
  • Roof works refurbishment
  • Full electrical rewire to 1st and 2nd floor office block
  • Staff Toilets and shower
  • Full kitchen installation
  • Fire & Sound partition works to demark new office layout
  • 1st fix joinery & 2nd fix bespoke joinery
  • 1st & 2nd fix electrical works
  • 1st & 2nd fix data, voice & media package
  • 1st & 2nd fix plumbing
  • Full gas inspection and service
  • 1nr Air conditioning package to new Comm’s Room
  • Full Decoration
  • Part flooring specification
  • Fire & intruder Alarms
  • Hand over

Refurbishment: BT Sport, Waterden Road, London

Project overview: Buildmain Ltd has carried out refurbishment works at BT Sport to assist Timeline TV in the construction of 6 No Edit Suites and PCR Rooms. Following our initial meeting with Designer Richard Goodliffe, we were further instructed to carry out the works below. There was a strict timeframe for the works to be completed, with essential on-site restrictions to be adhered to in regard to noise generation and Health & Safety considerations.

Construct new acoustic wall from slab to soffit 70mm C stud with 2 layers of 12.5mm Sound bloc plasterboard to each side. Overlapping boards, taped and filled. Deep channel and head sealed to floor and soffit - Void full filled with 50mm x 1200 insulation. To provide in excess of Rw50dB acoustic isolation between the rooms. 73LM to form new layout of 2nr PCR rooms & 4nr Edit suites.

Install Acoustic window glazed with 1 layer of 6.4 laminate and 1 layer 8.4mm laminate, fully sealed with 50mm airspace between.

Install MF Ceiling to form soffit board ceiling with Sound Bloc, this formed an Acoustic ceiling to 4 No suits and 3 No PCR rooms.

Supply and fit 8 No pre-finished doors to form Rw40db acoustic performance with fire rated self-closing devices pull handles and push plates.

All new walls tape and jointed to a high standard and a minimum of two coats of Johnstone Trade matt emulsion, ensuring a quality finish. Prepared new MDF square edge skirting & decorate to match existing.

Prepared floor, fit carpet tiles to finish.

The contracted works were completed within the designated timeframe and to client approval and satisfaction.

  • Client: Timeline Television
  • Designer: Richard Goodliffe Design
  • Form of contract: JCT
  • Value:  £90,000.00
  • Duration:  6 weeks June 2015
  • Pre-start planning meetings
  • Health and safety plan
  • Scope of Work site set up
  • Site strip as required
  • Demolition & site strip
  • 1st & 2nd fix joinery (structural partition walls)
  • Acoustic Partitions
  • MF Ceilings
  • Acoustic window
  • Doors
  • Full Decoration
  • Raised Access flooring
  • Carpet tile Flooring
  • Handover

Remedial works: Ascot Services RCCM Portland Weymouth

Project overview: Remedial & general repairs to Portland Weymouth MRCC Demolition works. Major structural repairs to gable end of building. Making good of all disturbed internal & external areas of building fabric. All works checked, passed

  • Client: Ascot Services in conjunction with Carillon & Maritime Coastguard Agency
  • Architect: Parsons Brinkerhoff
  • Contract: January - February 2012
  • Value: £28,000
  • Duration:2 weeks
  • Remedial works
  • General Repairs
  • Demolition
  • Major structural repairs
  • Making good

Refurbishment & maintenance: Maritime Coastguard Agency Frame Work Agreement

Project overview: Buildmain participated in the MCA refurbish & maintenance program 2011-2013 with an estimated overall budget of £1,000,000

  • Client: Ascot Services Carillon
    Maritime Coastguard Agency
  • Architect: Parson Brinkerhoff
  • Value: £400,000.00 value to Buildmain Ltd
  • Duration:3 years
  • Pre-start planning meetings
  • Health and safety plan
  • Scope of Work site set up
  • Site strip as required
  • Demolition & site strip
  • Installation of DDA compliant ramp
  • 1st & 2nd fix joinery (partition walls, steps, handrails)
  • 1st & 2nd fix electrical works (AC, Earth bonding, power and lighting, data and voice)
  • Plastering
  • Full Decoration
  • Raised Access flooring
  • Kingspan installation for ceilings
  • Fire Suppression equipment
  • Vinyl Flooring
  • Partition Wall

Demolition & rebuild: Merchant Taylor School, Crosby, Liverpool

Project overview: Buildmain Ltd has carried out the demolition and rebuilding of a new boundary wall and brick wall repair works at Merchant Taylor School in Crosby, Liverpool. Following our initial meeting with Frank Irwin, Alistair Marsden and Liverpool Council to discuss the disrepair of the existing boundary walls, Buildmain had various planning and consultation meetings to decide on the extent of the rebuilding and repairs, we were duly appointed and instructed to commence the works in July 2014. There was a strict timeframe for the works to be completed as we had to work during the school holidays. The contracted works were completed within the designated timeframe and to client approval and satisfaction.

  • Client: Merchant Taylor School
  • Value: £50,000
  • Duration: 6 weeks
  • Initial meeting
  • Planning & consultation
  • Pre-start planning meetings
  • Health and safety plan
  • Scope of Work site set up
  • Excavations of foundations
  • Concreting to foundations
  • Resin anchor installation to existing boundary wall
  • Construction of brickwork & pillars
  • Snagging and Handover

Cordoning off & signage works: clean reach ltd grays retail park coventry

Project overview: General cordoning off and safety signage works to the general public areas of clean reach ltd

  • Client: Clean Reach Ltd BCSC
  • Architect: IPS
  • contract: 2013
  • Value: £3,500.00
  • Duration:2 weeks
  • Cordoning off works & signage to general public area
  • Removal & washing down off existing non-slip treads & steps to various areas of retail park
  • Refurbishment & redecoration of perimeter railings & fencing around site
  • Watco anti slip Grip Master pedestrian grid resin coating over existing treads
  • All works checked, passed

Redecoration of listed building: Rope and Anchor Public House

Project Overview: Buildmain Ltd carried out full decoration works to the Rope and Anchor public house consisting of various steel scaffolds to the internal & external areas with protection sheeting on access areas so as to protect the general public as well as boarding carpets due to delicate working areas. Minor plaster patching and preparation works including seal masonry was carried out as applicable.All ceiling and wall areas received one mist coat & 2 further full coats of vinyl matt. Wood work was prepared and spot primed with one full under coat and one full gloss to finish. All protective screens were removed along with board coverings and debris was cleared away. The Public house was open for business throughout and unaffected by the works.

  • Client: JBJ Entertainments
  • Architect: N/A
  • Value: £14,000.00
  • Duration:  3 Weeks December 2012 - 3 Weeks 2nd Phase (March 2013 Expected Start Date)
  • Scope of Works, set up site
  • Supply protective screening and access equipment
  • Preparation
  • Minor Plastering Works
  • Full Decoration Specification under taken
  • Hand over

Refurbishment: Manchester City Etihad Stadium Ashton Old Road Manchester

Project overview: Buildmain Ltd has carried out refurbishment works at Manchester City Stadium to assist Timeline TV in the construction of a Media Room. Following our initial meeting with Designer Richard Goodliffe, we were further instructed to carry out Media Room Works. There was a strict time frame for the works to be completed, with essential on-site restrictions to be adhered to in regard to noise generation and Health & Safety considerations. The works consisted of constructing structural timber partitions for the media monitors and screens. The contracted works were completed within the designated time frame and to client approval and satisfaction

  • Client: Timeline Television
  • Designer: Richard Goodliffe Design
  • Form of contract: JCT
  • Value:  £15,000
  • Duration:  3 weeks August 2014
  • Pre-start planning meetings
  • Health and safety plan
  • Scope of Work site set up
  • Site strip as required
  • Demolition & site strip
  • 1st & 2nd fix joinery (structural partition walls)
  • Plastering
  • Full Decoration
  • Raised Access flooring
  • Installation of media monitors and TV screens
  • Vinyl Flooring
  • Partition Wall
  • Installation of media work station benches and various other equipment
  • Handover


Commendation:

To whom it may concern,

Whilst in my position of Construction Project Manager for a project at Manchester City Football Club, Etihad stadium. We sub contracted Buildmain Ltd to carry out the demolition/construction to convert a 3 room computer centre to a one room data centre for a new television broadcast service at the stadium. This included the removing of existing solid block walls, installing restraint components, patching and making good all surfaces, the onsite construction and installation of an access ramp and a raised access floor for the new ten rack data system.

All of this work had to be carried out with the only access being through a main working office at the club which could not be closed down or re located during this build. Also the time frame for these works was incredibly short due to work only being able to be carried out during the football off season.

Concurrently Buildmain were also responsible for the construction of two large pattrass panels for the mounting of TV monitors in the Programme control room. During all these works other contractors were also carrying out the installation of fire alarms, fire suppression systems and air conditioning therefore creating a very tight working space.

Mr Paul Bryan was the onsite Manager for all these works and carried out this position faultlessly.

At no time during the demolition/construction phase were there any complaints from any of the stadium staff re excess noise, dust or inconvenience. The works were scheduled in a logical order and carried out to a very high standard. All HSE requirements were met at all times and the site was always kept in a tidy manner.
Mr Bryan is commended for his control, workmanship and understanding of the task at hand.

If any further information is required please do not hesitate to contact the undersigned.

Graeme Keenan, Construction Project Manager

New Build Extension & Refurbishment Works: Meadowbank Primary and Nursery School

Project overview: Buildmain Ltd carried out New Build & refurbishment works to above areas in liaison with NPS, school governors and senior management. Due to a tight schedule we carried out the program in record time in order to enable re-opening of new staff room in time for the new school term.We carried out a the construction of the new extension using a list of construction disciplines, all works were carried out under CDM regulations.

  • Client: Meadowbank School
  • Architect: NPS
  • Contract JCT Value: £44,000
  • Duration: 12 weeks (Completed in 8 weeks)
  • Refurbishment of Changing Rooms, adjacent corridors, First Aid Room and welfare areas
  • Format Health & Safety Plan
  • Scope of Works, set up site
  • Demolition
  • Ground Works
  • Drainage/Landscaping/Tarmac
  • Brick/Block Work
  • Roof Fabrications & Coverings
  • Suspended Ceilings
  • 1st fix joinery
  • 1st & 2nd fix electrical works
  • 1st & 2nd fix plumbing
  • Plastering
  • Fit Out
  • Full Decoration
  • Polysafe flooring
  • Hand over
  • WMBC Building Control Completion Certificate

Full Refurbishment: Vivalis Trowbridge Full Office And Warehouse Refurbishment

Project overview: Buildmain Ltd where tasked with Re-siting Vivalis Ltd from Skelmersdale to new premises in Trowbridge. The premises required a full bespoke makeover so Vivialis could seamlessly move from their existing site in Skelmersdale to their new premises in Trowbridge. Buildmain Ltd planned and project managed the works which consisted of carrying out full refurbishment works to Newbury House.

  • Client: Vivalis Ltd
  • Architect: N/A
  • Value: £270,000.00
  • Duration: 14 Weeks September-December 2013-14
  • Alterations to Reception area
  • Pre-start and preliminaries
  • Set up & welfare
  • Site strip as required
  • Asbestos removal
  • Demolition
  • Roof works refurbishment
  • Full electrical rewire to warehouse and 1st and
  • 2nd floor office block
  • Directors Toilets and shower full refurbishment
  • Staff Toilets and shower
  • Full kitchen installation
  • Bespoke glass partitions to form offices and meeting rooms over 2nr floors
  • Brick work/Block work alterations to various elevations
  • 1st fix joinery & 2nd fix bespoke joinery
  • 1st & 2nd fix electrical works including full outside lighting package
  • 1st & 2nd fix data, voice & media package
  • 1st & 2nd fix plumbing
  • Full gas inspection and service
  • 8 Air conditioning package
  • Full Decoration
  • Full flooring specification
  • 16 camera CCTV remote monitoring system with powered access point
  • Fire & intruder alarms
  • Line marking to car park
  • Hand over

Full Refurbishment of a Listed Building: Rope and Anchor Public House

Project overview: Buildmain Ltd carried out full refurbishment works to the Rope and Anchor Public House working alongside senior management at JBJ Entertainments. Works consisted of various steel scaffolds to the internal & external areas with protection sheeting on access areas so as to protect the general public as well as boarding carpets due to delicate working areas. Demolition & strip out works to welfare, main bar areas & living quarters until final hand over and completion. The Public House was open for business throughout and unaffected by the works.

  • Client: JBJ Entertainments
  • Architect: N/A
  • Value: £60,000
  • Duration: 8 Weeks November 2012 - January 2013
  • Scope of worksite set up & welfare
  • Site strip as required
  • Asbestos removal
  • Demolition
  • Roof works
  • Kitchen and showroom
  • Directors Toilets and welfare
  • Brick work/Block work
  • 1st fix joinery
  • 1st & 2nd fix electrical works
  • 1st & 2nd fix plumbing
  • Plastering
  • Full Decoration
  • Hand over

Property Alterations: Cheshire County Football Association

Project overview: Buildmain Ltd carried out alteration works to the reception area at CCFA. The works consisted of the construction and protection of studded walls as well as boarding to carpets due to the delicate working area and presence of the general public.

  • Client: CCFA
  • Architect: IPS
  • Contract: 2011
  • Value: £11,000
  • Duration: 2 weeks
  • Scope of Works, set up site
  • Brickwork
  • 1st fix joinery
  • 1st & 2nd fix electrical works
  • 1st & 2nd fix plumbing
  • Plastering
  • Full Decoration
  • Hand over

Water Damage: Cheshire County Football Association

Project overview: Buildmain carried out refurbishment works to the changing rooms, corridors, first aid room and welfare areas at the CCFA due to flood damage. Working alongside Senior CCFA staff and to a tight schedule to enable re-opening of changing rooms, we carried out a full strip out of all the damaged walls, ceilings, doors and flooring as required and replaced with new including all decoration works.

  • Client: CCFA
  • Architect: Not Required
  • Contract: 2011
  • Value: £23,000
  • Duration: 2 Weeks
  • Refurbishment of Changing Rooms, adjacent corridors, First Aid Room and welfare areas.
  • Scope of Works, set up site
  • Changing, first Aid and welfare rooms
  • Site strip as required
  • Suspended Ceilings
  • 1st fix joinery
  • 1st & 2nd fix electrical works
  • 1st & 2nd fix plumbing
  • Plastering
  • Full Decoration
  • Polysafe flooring
  • Hand over


Commendation from CCFA: Hi Jeff / Jill. Just wanted to say thanks for all your hard work and effort in getting out office, changing rooms and admin centre back up and running after serious flooding occurred recently, all of the contractors on site have been very professional and done an excellent job. I look forward to working with you all again and I will have no hesitation to recommend your company to the Football family in Cheshire. Regards, Simon Gerrard | County Development Manager Cheshire Football Association

Fence Erection: Mark Two, Raikes Lane, Bolton

Project overview: Removal of the existing perimeter fence and erection of a new perimeter fence. The fence backed on to farm land with live stock, therefore the specification included straining posts and intermediate posts, wire & pig mesh of approx 250Lm.

  • Client: Mark Two
  • Architect: IPB Associates
  • Form of contract: FMB Contract
  • Value: £15,000
  • Duration: 4 Weeks
  • Scope of Worksite set up & welfare
  • Set Up Site
  • Liaise with 3rd Party
  • Demolition of Existing fence
  • Erect New Perimeter Fence
  • Check
  • Hand over

Renovation & Refurbishment: Mark Two, Raikes Lane, Bolton

Project overview: Conversion and refurbishment of an existing warehouse unit to provide a new kitchen showroom and distribution centre, together with office accomodation, call center unit and full staff facilities.

  • Client: Mark Two
  • Architect: IPB Associates
  • Form of contract: FMB Contract
  • Value: £356,000
  • Duration: 1 year
  • Conversion and refurbishment of existing warehouse unit into Showroom with ancillary facilities
  • Scope of Worksite set up & welfare
  • Site strip as required
  • Asbestos removal
  • Demolition
  • Roof works
  • Kitchen and showroom
  • Directors Toilets and welfare
  • Brick work/Block work
  • 1st fix joinery
  • 1st & 2nd fix electrical works
  • 1st & 2nd fix plumbing
  • Plastering
  • Full Decoration
  • Hand over

Dilapidations Project: Vivalis Ltd, Grimrod Place, Skelmersdale

Project overview: Buildmain Ltd carried out Dilapidation works on 21No. industrial units in association with the Landlord West Lancashire Council and the tenant Vivalis Ltd. The dilapidations works were carried out under CDM, each unit had full specification, scope of works and was refurbished to its original status for hand over to Landlord West Lancashire Council.

  • Client: Vivalis Ltd
  • Architect: IPB Associates
  • Form of contract: JCT
  • Value: £1,000,000
  • Duration: 2 years
  • Full dilapidation schedule for 21No. industrial units
  • Health and safety plan
  • Pre-Start planning meetings
  • Set up temporary site cabins
  • Powered and fixed access
  • Scope of Work site set up & welfare
  • Site strip as required
  • Asbestos removal (Approved contractor)
  • Demolition & site strip
  • Kitchen
  • Roof works
  • Toilets and welfare refurbishment
  • Brick/Block work on new build & refurbishment
  • 1st & 2nd fix joinery
  • 1st & 2nd fix electrical works
  • 1st & 2nd fix Plumbing & Gas Works
  • Plastering
  • Full Decoration
  • Ground Works
  • Car parking line marking
  • Hand over

Social Housing Project: Page Field Close, Wigan

Project overview: Conversion of 8No. Studio flats redesigned into 4No. 1 bed lats for elderly residents.

  • Client: Wigan Borough Council
  • Architect: NPS
  • Form of contract: JCT Minor Building Works 
  • Value: £90.000
  • Duration: 14 weeks
  • Conversion of 8No. studio flats redesigned into 4No. 1 bed flats for elderly residents
  • Scope of worksite set up & welfare
  • Site strip
  • Asbestos removal
  • Demolition
  • Redesign & refit
  • Kitchen
  • Specialist Bathroom refit
  • Brick work
  • 1st fix joinery
  • 1st & 2nd fix electrical works
  • 1st & 2nd fix plumbing
  • Plastering
  • Full Decoration
  • Hand over

To talk to us about your own construction project, call 01942 889 208