Meeting The Needs Of Today

Outreach

Job Information

Client

Outreach Community & Residential Services

H & S

Site Managers

Value

£100,500.00

Duration

8 weeks

Job Description

1st Floor phase 1 fit out refurbishment to create new office space and community facilities.

Pre-start Meeting and provide all RAMS.

Isolate all services, strip and remove existing welfare and all partition ready to take new.

Remove existing window and supply and fit new, mechanically cut out pre-cast concrete.

And remove staircase, supply and fit new timber staircase as per drawing along with required. 

Hand rail, supply and fit new partition and suspended ceilings as per drawing to create new lay out and office and welfare areas, Fit new architraves door liners with fire doors and ironmongery to suit.

Tape and joint all partition as required and decorate.  

Supply and fit new kitchen as of required lay out with all appliances requested. 

Upgrade plumbing and supply and plumb new Combi boiler and required Rads with TVR’s and all associated pipework, alterations made to drainage to accommodate new lay out. 

DDA supply and fit Doc M pack with required toilet pan and all associated pipe work along with shower and small cloak room sink, create wet floor area to accommodate shower with shower bar and mixer tap, Tile all welfare areas and kitchen splash back.  

Electrical, supply and upgrade all new lay out, sockets, LED lights, Cat 5 data points, emergency lighting and fire alarm, fit intercom system along with required telephone points. 

Make new entrance door opening, supply and fit new entrance doors and fit all new required ironmongery.  

Lay carpet tills to required areas. 

Works were completed in budget and on time.

Before & During Pictures

Finished Pictures

Summary

Scope of Works

  • Pre start and preliminaries
  • RAMS 
  • Site set up site 
  • Strip out 
  • Plumbing/heating 
  • Electrical 
  • Joinery 
  • Mechanical concrete cutting 
  • Tiling 
  • Suspended Ceiling 
  • Stud & Track 
  • Decoration 
  • Air conditioning 
  • Flooring 
  •  

22 Responses

  1. Pingback: paypal cialis
  2. Pingback: effexor xr dosage
  3. Pingback: remeron anxiety
  4. Pingback: actos rutinarios
  5. Pingback: diltiazem dosage
  6. Pingback: synthroid snort